Risk assessment: Difference between revisions

From CUADC Wiki
Jump to navigation Jump to search
(New page)
 
mNo edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Shows at the [ADC Theatre] or [Corpus Playroom] need to carry out specific '''risk assessments''' to be approved by [ADC Management] before the [get-in]. This comprises of 5 sections and Section 1 (or the General Information Form) is usually completed by the [Producer] then Section 2,3,5 by the [Technical Director] and/or [Lighting Designer]. Section 4 is completed by the [Stage Manager]. Smaller shows such as a [lateshow] or a [ONS (One Night Stand)] will have a reduced risk assessment to complete.
Shows at the [[ADC Theatre]] or [[Corpus Playroom]] need to carry out specific '''risk assessments''' to be approved by [[ADC Management]] before the [[get-in]]. This comprises of 5 sections and Section 1 (or the General Information Form) is usually completed by the [[Producer]] then Section 2,3,5 by the [[Technical Director]] and/or [[Lighting Designer]]. Section 4 is completed by the [[Stage Manager]]. Smaller shows such as a [[lateshow]] or a [[ONS (One Night Stand)]] will have a reduced risk assessment to complete.


All current risk assessments can be viewed [https://drive.google.com/drive/folders/1lkp3BjMAAt90AYp5rirYOUeqC0jkQT-1 here] If you need help filling out a risk assessment, ADC Management run regular workshops or are generally available to help! Relevant members of the [CUADC] Committee are also happy to help if needed, especially on shows funded by CUADC.
All current risk assessments can be viewed [https://drive.google.com/drive/folders/1lkp3BjMAAt90AYp5rirYOUeqC0jkQT-1 here] If you need help filling out a risk assessment, ADC Management run regular workshops or are generally available to help. Relevant members of the [[CUADC]] Committee are also happy to help if needed, especially on shows funded by CUADC.

Latest revision as of 00:07, 31 December 2023

Shows at the ADC Theatre or Corpus Playroom need to carry out specific risk assessments to be approved by ADC Management before the get-in. This comprises of 5 sections and Section 1 (or the General Information Form) is usually completed by the Producer then Section 2,3,5 by the Technical Director and/or Lighting Designer. Section 4 is completed by the Stage Manager. Smaller shows such as a lateshow or a ONS (One Night Stand) will have a reduced risk assessment to complete.

All current risk assessments can be viewed here If you need help filling out a risk assessment, ADC Management run regular workshops or are generally available to help. Relevant members of the CUADC Committee are also happy to help if needed, especially on shows funded by CUADC.